How to do the problem of empty tiles in tiles?

In modern home decoration, the application fields of wall and floor tiles are more and more extensive. However, for a variety of reasons, after the use of wall tiles for a period of time, often occur local wood tiles and even fall off, not only affect the use effect, but also to the whole wall and the ground to leave a piece of ugly “scars”.

If the sand pulp is not loose, only the bathroom tiles are shedding, and the mortar that adheres to the back of the kitchen tiles can be scraped, and a little cement is mixed into the 107 glue, and a thin layer is evenly coated on the back of the cement tiles, then the tiles can be pressed together later.

If the sand pulp falls along with the tiles design together, after a slight chisel on the original base, the sand pulp with 107 glue is set up, or the cement, E 44 epoxy resin, acetone, and ethylene diamine chemical shop are mixed with the proportion of 5:3:2:1, and brush a layer on the base surface with the brush, and then the shedding tiles price are pressed up until the sand pulp is hardened.

It should be noted that if tiles are partially shedding, they must not pound the sand on the foundation surface to prevent the original marble tiles from being broken. It is required that the cement slurry binding layer should be evenly brushed and the brushing time can not be too long, so as to prevent the wind from drying and harden, resulting in the separation of the surface layer from the base layer and causing the drums to rise.

Strictly mix the sand mixture according to the ratio, and do not add any water. The mortar must be dry and hard, and the thickness should be controlled at 2-3 centimeters. When paving the flooring tiles, clean the back floating dust, moisten and moisten, and ensure the good bonding. When the floor tiles design are laid, the four corners are pressed with strength to make it contact with the pulp parallel, and the drawing line is 2-3 centimeters high. Then the hammer or the rubber hammer is struck, and the face is leveled with a horizontal ruler. After paving one tile, it will be pasted in two directions. If there is any subsidence phenomenon, the polished tiles should be lifted and paved with mortar.

In home decoration, it is necessary to deal with strong electric (lighting, electrical appliances) and weak lines (television, telephone, audio, network, etc.) buried wires, and wires are very important. Selection of wire specifications: family decoration, according to the national regulations, lighting, switch, socket to use 2.5 square wires, air conditioning to use 4 square wires, water heater to use 6 square wires.

The construction principle of water and electricity is that the top can not walk, the top can not walk, considering the wall, the wall can not walk, only to consider the ground, the line of the top is inside the ceiling or the plaster line, even if there is a fault, the repair is also convenient, and the loss is not great. If all of them are gone, overhaul will guide the floor to lift up. The ground is concrete structure. To bury the pipe, it will damage the concrete layer and even the reinforcement.